The Salton Sea Authority has issued a Request for Proposal/Qualifications (RFP/Q) for the Desert Shores Restoration Project.
The Salton Sea Authority says that the Restoration Project aims to develop a feasibility study comprised of Geotechnical, Geologic, and Hydrogeologic Services for the proposed restoration project. The project looks to revitalizing five dry shoreline channels previously connected to the Salton Sea. Venor selection is expected by late October 2024.